Skip to content
Jamie Italian

Jamie Italian

Case Studies / Jamie Italian

The DSEAR assessment was required in order that the the company could prove to Gatwick Airport that additional local exhaust ventilation was not needed (which would have been costly to install). The new restaurant planned for Gatwick Airport would include a pasta making facility that will be fully enclosed in a glass booth inside the restaurant. It is here that the flour, water and egg powder would be mixed. Additionally the separate storage area would be be used for storage and the decanting and transfer of bags of flour into specially designed trolleys for transportation to the restaurant.

Perfect – the report is great thank you. Gavin Beesley – Construction and Project Delivery Manager

Back to Case Studies